BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly
BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly
BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly
BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly
BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly
BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly

BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly

2012-11-05 18:58:40  

Quality BMW series Driveshafts manufacturer & exporters-buy BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly from China supplier Ameridrivetrain Group!

  • Mfg Part # : AM25866
  • OEM Part # : 26208605866 26207597649
  • Payment terms : T/T or L/C

BMW X5 X5M X6 X6M (E70 E71) 2011-2017 OE replacement Parts # 26208605866 26207597649 Front Driveshafts Propeller shaft assembly 

Ameridrivetrain Group are the best professional Driveshafts Propeller shaft assembly manufacturer and exporter,All Ameridrivetrain products are manufactured to meet or exceed original OEM performance, If you are looking for quality suppliers from China, believe we are your best choice!!

Email:sales@ameridrivetrain.com

what‘sApp/Wechat:+86 18901736375

Telephone:+86 18901736375

www.ameridrivetrain.com

Condition:

New

Brand

Ameridrivetrain

Material:

Steel 45#, 40Cr,20CrMnTi

Application Cars:

BMW X5 X5M X6 X6M (E70 E71) 2011-2017  

Dimension:

-

Positions on Vehicle:

front Propeller Driveshaft

Surface Finish:

Polished,Rust Protected

Inspection:

100%

Certificate:

ISO/TS16949

Customized service

Accept

Place of Origin:

 China

Package: 

PVC bag + Cartons + Wooden pallet

Warranty:

*Brand New! Great quality meet or exceed OE performance

*Follow ISO/TS16949 the strictest 100% inspect standards

*12 months unlimited mileage warranty

*The competitive price available and save to help you share more market

*Free returns or refunds make your after-sales services better than other distributors.

Heavy Equip.Parts Supplier|Universal Joint|PTO Shaft|Bucket Bush Pins Manufacturer

Drive Shaft-Shaft Parts-Cardan Shaft-Supplier

Fitment Vehicles

BMW X5 2011-2015 

BMW X5 2016 4.4L (twin turbo)

BMW X5 2016-2017 3.0L

BMW X5 2017 4.4L

BMW X5M 2011-2013 (4.4L, twin turbo)

BMW X5M 2015-2017 (4.4L, twin turbo)

BMW X6 2011-2017 

BMW X6M 2011-2017 (4.4L, twin turbo)

Drive Shaft-Shaft Parts-Cardan Shaft-Supplier

Drive Shaft-Shaft Parts-Cardan Shaft-Supplier

FAQ

Q1: How can I get pricing?

A1: Email us Parts Number. (Samples or drawings provided be preferred), quantity you need, if any specific material or surface treatment required. We will send you quote within 48 hours. 


Q2: How do I get samples?

A1: If we have product in stock, free sample could be provided. If not, we will send over similar product for reference, or make sample for approval with additional cost. 


Q3: What is your payment terms:

A3: Our payment term is 30% in advance, and 70% before shipping against copy of B/L. We accept PayPal or Wire Transfer. 


Q4: What is your shipping terms:

A4: We could arrange shipping by ocean to your nearest ocean port, or to your door. Air Freight is also available. We could help take care of all the import procedure. Ocean freight takes around 25-40 days, and air freight takes 3-7 days. 


Q5: Do you test your products before shipping, what if there is any quality problem? 

A5: We 100% test our products before shipping. If any quality problem does happen, we will replace all the faulty ones at our shipping cost, or refund to you. 


Q6: What about lead time?

A6: For first order, usually lead time around 45-60 days. For repeat order, usually around 30-45 days.


Q7: Do you make custom parts? 

A7: Absolutely definitely YES! Outperforming the factory original is what we do. We could make parts according to your sample or drawing, and we could offer suggestions on how to design the products to make it stronger!